Testing, Adjusting & Commissioning (TAB)

Making sure every room gets the right temperature and airflow after installation.

Even the highest-end equipment will underperform if not balanced and commissioned correctly. MVACC's dedicated TAB engineers use calibrated digital instruments to balance air velocity across every grille, verify chilled water flow rates, calibrate thermal expansion valves, and measure compressor power draw to guarantee rated efficiency.

Key Deliverables

Technical Specifications

Target Sectors

Execution Process

  1. Pre-Commissioning Mechanical Checklist: Verifying duct cleanliness, damper operability, filter installation, and rotational direction.
  2. Air & Hydronic Balancing: Adjusting volume control dampers and balancing valves starting from main branches to terminal grilles.
  3. Electrical & Thermal Run Test: Recording delta-T (temperature split), compressor current draw, and oil pressure under peak load.
  4. Certified Documentation Handover: Issuing signed test sheets with as-built flow rates, equipment serials, and warranty validation.

Frequently Asked Questions

Why is TAB necessary after HVAC installation?

Without proper balancing, rooms furthest from the AHU remain warm while rooms nearest become uncomfortably cold. TAB balances distribution so every zone receives exact design airflow and temperature.

Do you provide testing reports for IGBC or LEED green building certification?

Yes. Our comprehensive commissioning logs satisfy IGBC and LEED fundamental commissioning requirements.